Under normal condition aircraft
shall start up all engines before commencing
pushback.
Two aircraft may be given
permission to pushback simultaneously provided
that :
They are positioned at least
three bays apart (e.g. stand A-1 and A-4, B-3 and B-6).
They are separated by at least
three bays after the completion of pushback.
They are facing the same direction
after pushback (see figure 1 below). Figure
1. Pushback
simultaneously
0 comments:
Post a Comment