Sunday, October 23, 2016

Start UP/Pushback Procedure For Other Aircraft

Share
Under normal condition aircraft shall start up all engines before commencing pushback.
Two aircraft may be given permission to pushback simultaneously provided that :
They are positioned at least three bays apart (e.g. stand A-1 and A-4, B-3 and B-6).
They are separated by at least three bays after the completion of pushback.

They are facing the same direction after pushback (see figure 1 below). Figure 1. Pushback simultaneously

0 comments:

Post a Comment